We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Misclassifying a crack is the single most common mistake in this trade — treating a structural crack with the wrong material, or injecting a crack that actually needed a broader drainage fix behind it. We classify before we inject, every time.
Our technicians are trained to tell a cosmetic hairline crack apart from one that signals structural movement, before recommending a fix.
Most crack injection appointments can be scheduled within a day or two of your call.
A single crack repair is one of the most predictably priced jobs we do — no surprise scope creep.
Polyurethane expands to fill voids behind an actively weeping wall; epoxy is reserved for cracks that need structural bonding.

We scope every Foundation Crack Repair job in person before quoting it, since two properties with the same symptom rarely need the same fix.
Epoxy-injected cracks regain much of their original structural strength, which matters for load-bearing foundation walls.
Polyurethane cures even in the presence of water, which makes it the right call for a crack that's actively letting water through.
Stair-step cracking in block foundation walls needs a different injection port pattern than a vertical crack in poured concrete, and we adjust technique accordingly.
Vertical cracks are usually settlement-related and often isolated; horizontal cracks can indicate hydrostatic pressure pushing on the wall and get flagged for further evaluation.
Fast turnaround matters during a real estate transaction, and we prioritize scheduling for time-sensitive pre-sale repairs.

Tell us the crack's location, whether it's actively leaking, and roughly how wide it is so we can bring the right materials.
A technician measures crack width, checks for wall bowing, and determines whether it's structural, cosmetic, or actively leaking.
You'll get a price based on crack length and material — epoxy or polyurethane — before any drilling starts.
Most single-crack injections are completed in a few hours, start to finish, in one visit.

"Crack in our basement wall had been leaking for a year before we finally called. Injection took less than an afternoon and it's been dry since."
— Fayetteville Seller
"They explained why our crack was structural and not just cosmetic, which the previous contractor never bothered to check."
— Fayetteville Homeowner
"Had two cracks — one needed epoxy, one needed polyurethane. They matched material to each one instead of using the same thing on both."
— Fayetteville Customer
"Fast, clean work — no mess left behind after the injection ports were patched."
— Fayetteville Homeowner
Active leaks get flexible polyurethane regardless of classification, since stopping water intrusion is the immediate priority.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
Epoxy is better for structural bonding on a non-leaking crack; polyurethane is better for a crack that's actively weeping since it cures even with water present.
Multiple cracks or hard-to-access areas can extend the timeline, which we'll flag in the written quote.
A properly injected crack is unlikely to reopen at the same spot, and our work comes with a written warranty covering exactly that.
Turnaround is usually fast enough to fit within a typical closing timeline.
We handle foundation crack injection throughout Fayetteville and the surrounding Fayetteville, OH service area, including the zip codes listed below.



Zip codes we serve in Fayetteville, OH: 45118
One call gets you a licensed specialist, a written quote, and a same-day time window.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.